|
 |
Orissa
Power Generation Corporation Limited (OPGC) was incorporated
on November 14, 1984. OPGC started as a wholly owned Government
Company of the State of Orissa with the main objective of establishing,
operating & maintaining Thermal power generating stations.
In the pursuit of its objective, OPGC established IB Thermal Power Station having two units of 210 MW each in the Ib valley area of Jharsuguda District in the State of Orissa. These Units have become operational since 1994 (1st Unit) and 1996 (2nd Unit) respectively. More .... |
 |
 |

A world-class power utility committed to generate clean, safe and reliable power, enhancing value for all stake holders and contributing to national growth. ......more |
|
 |
|
|
|
 |
CORRIGENDUM NOTICE NO.ITPS/CC-22/2011/17/CORR-2 |
 |
REQUEST FOR PROPOSAL for the selection of “ITC DEVELOPMENT AGENCY” for the development of a “QUALITY RESIDENTIAL INDUSTRIAL TRAINING CENTRE” |
 |
CORIGENDUM NOTICE NO. ITPS/CC-22/2011/14, Dt.20-10-2011(“ Consultancy service for 1. Switching over to HCSD System from the existing conventional ash slurry discharge system, 2. Up-gradation of ESP )” |
 |
EOI No. ITPS/CC-22/2011/14, Date: 20/10/2011 (“ Consultancy service for 1. Switching over to HCSD System from the existing conventional ash slurry discharge system, 2. Up-gradation of ESP )” |
 |
EOI-12 (Providing Scaffolding Services Along with Matrials.) |
 |
OPGC (Units-3 & 4) NIT - Balance of Plant |
 |
OPGC (Units-3 & 4) RFP - Balance of Plant |
 |
Supply, installation and commissioning of CISCO Tandberg Video Conferencing System in three locations OPGC |
| |
EOI. No. ITPS/CC-22/2010/85 |
| |
EOI. No. ITPS/CC-22/2010/82 |
| |
EOI. No. ITPS/CC-22/2010/81 (A) |
| |
EOI. No. ITPS/CC-22/2010/81 (B) |
| |
"Clause No.20.0 of the Special Conditions of Contracts of the Bid Documents for the works of Sl.No.1 & 2 of the NIT No.ITPS/CC-22/2009/78, dtd.05-09-2009 stand deleted." |
| |
(“NIT”) FOR REVIVAL OF 2X325 KW MINI HYDEL PROEJCT AT BADANALA |
| |
OPGC invites expression of interest from reputed consultants / consulting firms for providing consultancy services in respect of revival of three mini hydel projects namely, (1) Harabhangi (2x1000 KW), (2) Barboria (2x325 KW) & (3) Banapur (2x150 KW). |
| |
General Terms And Condition For Purchase Tender. |
|
With reference to our tender documents No ITPS/CC-22/2008/68, dated 03rd Sep'2008 and the Corrigendum Notice No. CC/68/CORR-III dated 08/11/2008, It is to intimate you that tender date is hereby extended as follows
a) Date of receipt/submission - up to 1.00PM of 09.12.2008
b) Date of Opening - at 3.00PM of 09.12.2008
N.B: All other stipulations/conditions of NIT No ITPS/CC-22/2008/68, Dt.03.09.2008 shall remain unaltered. |
| |
Vendor Registration Form |
|
 |
 |
 |
| |
OPGC has been accorded Envirnoment Clearance for capacity addition of 2X660 MW Thermal Power Plant at IB Thermal Power Station.  |
| |
We received the CII award (1st) in Best Practices on SHE on 20th Nov, evening from Honorable Chief Minister, Orissa with his message "Well done OPGC & Congratulation".. |
 |
| |
 |
OPGC recieved the "Greentech Environment Excellence Gold Award" for the
year 2008 in the 9th Greentech Environment Award function in Goa on 5th September 08. |
| |
• OPGC received First Prize in Lowest weighted frequency rate of Accident by Directorate of Factories and Boilers, Orissa , Bhubaneswar " |
 |
| |
 |
• OPGC received "Greentech Safety Gold Award-2007" |
| |
• OPGC received "Greentech Environment Excellence Gold Award-2006" |
 |
| |
 |
• OPGC Declares Interim Dividend for 2005-06 |
| |
• OPGC (ITPS) received "CII-Orissa Award
for Best Practices in Environment , Safety & Health (ESH)-Runner". |
 |
| More .... |
|